Skip to product information
1 of 7

Askrig02

DOVOH 4x360° Laser Level 360 Self Leveling, 16 Line Laser Leveler for Construction Floor Tiling and Ceiling Rechargeable Green Beam 4D Plane Magnetic Bracket Included, K4-360G

DOVOH 4x360° Laser Level 360 Self Leveling, 16 Line Laser Leveler for Construction Floor Tiling and Ceiling Rechargeable Green Beam 4D Plane Magnetic Bracket Included, K4-360G

Regular price $210.56 USD
Regular price $210.56 USD Sale price $210.56 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

Brand: DOVOH

Color: Green

Features:

  • 【Overmold Rubber Housing】DOVOH 4d laser level features an overmold rubber housing, providing enhanced durability and shock resistance. This robust design protects the tool from impacts and harsh working conditions, ensuring reliable performance and longevity on the job site.
  • 【Versatile 4D Laser Level】This 4x360 laser level is equipped with two horizontal and two vertical plane lasers. The top laser efficiently reaches close to the ceiling, while the bottom laser is perfect for floor tiling applications. This 4 plane laser level is designed to meet the diverse needs of your projects with precision and versatility, suitable for various leveling tasks, including tiling, drop ceiling installation, and square layout.
  • 【Self-Leveling & Manual Mode】The 360 laser level will auto level on self-leveling mode. DOVOH laser level features stable precision that will maintain qualified accuracy for incline angle less than ±4°, it ensures reliable and accurate performance for various harsh environments. When working on manual mode, the laser lines can be locked at any angle for customized applications.
  • 【Magnetic Bracket & Dual Batteries】DOVOH construction laser level include a multifunctional magnetic bracket, it can attach to a metal surface, clip on a board, or hanging on a nail. K4-360G laser level includes dual 7.4V 2600mAh lithium rechargeable batteries, which provide longer working time.
  • 【Pulse Mode for Outdoor Use】The laser level 360 self leveling support pulse mode, it works with a 10 KHz laser level receiver. The working range can be extended to 197ft/60m under pulse mode with a laser receiver. DOVOH high accuracy laser level receiver is recommended to be used with K4-360G laser level.
  • 【5 Years Accuracy WTY】DOVOH provides 5 years accuracy WTY for all laser levels. For unqualified accuracy caused by normal use in 5 years, DOVOH will repair or replace with a new unit at no cost. Also, DOVOH provides 2 years WTY for any quality issue.
  • Laser Class: Class Ⅱ. IEC 60825-1:2014<1mW, 520nm

Binding: Tools & Home Improvement

model number: K4-360G

Part Number: K4-360G

Package Dimensions: 11.3 x 9.7 x 6.9 inches

View full details